Body Text
Competitive advantage
- Largest and most comprehensive hydraulic laboratories in Australia with over 5,000m2 of floor space, as well as high flow-rate flumes
- Extensive experience in conducting performance assessment of hydraulic structures such as dam outlet works, spillways and hydro power stations
Impact
- Provides an internationally renowned, integrated approach to hydraulic engineering problems and world-class solutions.
Successful applications
- World’s first application of Lidar for the measurement of aerated surfaces to assist in dissipator design
- Development of a miniature, neutrally-buoyant accelerometer and pressure transducer device to assess fish passage
- Increased flow capacity with a 1,000 L/s pump
- Scour assessment of rip-rap using a 3D terrestrial scanner
Capabilities and facilities
- 5 fully-equipped physical laboratories
- 1.5 m3/s flows
- Large spillway flume
- Extensive suite of laboratory sensors including wave probes, current meters, LIDAR, 3D FARO, submersible load cells and pressure sensors
Our partners
- GoldWind Wind Farm
- CSIRO
- Ausgrid
- Aurecon